1.Project Site
The Western
Area of Yantai Port is situated in the west of the city proper, as well as
besides the northeast sea of DajijiaVillage in Yantai Economic & Technological
Development Zone (YETDZ), with a distance of 35 km on the sea and a distance
of 30 km on land to ZhifuBay. The proposed crude oil terminal is located in
the northeast of the western port area.
2. Project Scope
Two crude oil berths (also can be utilized for oil products) of 300,000 DWT
and 100,000 DWT respectively, with a wharf length of 820 m and a bridge length
of 370 m. The annual throughput volume is 21 million tons for crude oil and
6 million tons for oil products. The construction period of the abovementioned
project is 2 years.
The tank zone covers an area of 700,000 square meters, which is within 1,000
m behind the crude oil terminals and can be further expanded in the future.
In this area, tanks are be constructed respectively for crude oil (600,000
cubic meters, 8 tanks) and oil products (240,000 cubic meters, 12 tanks).
3. Project Progress
The project has been included in the general planning of Petroleum Transshipment
and Reserve Base as well as the 11th Five-Year Plan of Shandong Province. Up
to now the Feasibility Study Report of this project has been completed, which
will be subject to the review and approval by the government.
4.Traffic Analysis
Along with the booming-up of auto industry and the fast economic growth on
the rim of BohaiSea and YantaiCity, the refineries and chemical industries
in ShandongProvince are witnessing a continuous development. As a result, there
is an increasing demand on crude oil and refined oil. Many large-sized chemical
corporations are planning to invest in the region of BohaiSea, and one of them
has determined to invest in a petroleum transshipment facility and the related
industries in YantaiPort, with an annual throughput of 4 million tons. It is
forecasted that the traffic of crude oil in YantaiPort will be 5 million tons
in 2010 and 15 million tons in 2020. After the project completion, the handling
capacity of crude oil and refined oil in YantaiPort will be up to 26 million
tons per annum.
5.Distribution and Transportation Conditions
Railway:The inner-port railway, connecting with the national railway network
through Lancun-Yantai railway, possesses an outstanding transport capacity.
Meanwhile two additional railway lines (i.e. Dezhou-Longkou-Yantai and Huanghua-Longkou-Yantai)
are under construction and will be fully completed for operation in 2008.
Road: According to the planning, several port access roads will be integrated
with the provincial road network by direct connection with Tongjiang-Sanya
Expressway, Weihai-Wuhai Expressway and No. 206 National Road.
6.Investment and Economic Analysis
The total investment of the project is estimated to be RMB 1.3 billion yuan.
The Economic Internal Return Ration of the project is evaluated as 17.69%,
and the FIRR (after tax) turns out to be 11.09%. The investment recovery period
is anticipated to be 9.52 years (including the construction period).
7.Cooperation Partners
For the purpose of this project, we are willing to cooperate with the famous
petro-chemical corporations, chemical industries, logistic service providers,
shipping companies, terminal operators and investment companies all over the
world.
8.Cooperation Mode
The cooperation modes are proposed as follows:
-Terminal
A limited company shall be established by relevant parties for the construction
and operation of the terminals.
-Tanks
(i)A limited company shall be established by relevant parties for the construction
and operation of all or part of the storage/transportation facilities; or
(ii)A limited company shall be solely established by the foreign partner for
the construction and operation of all or part of the storage/transportation
facilities.
9.Preferential Policies
According to the Catalogue for the Guidance of Foreign Investment Industries
issued by the State Government, this project shall be included in the Catalogue
of Encouraged Foreign Investment Industries. Foreign-funded enterprises which
are engaged in the construction of public dock facilities of ports and scheduled
to operate for a period of over 15 years shall, upon approval by relevant taxation
administrations, be exempt form enterprise income tax for the first to the
fifth profit-making years, and will be subject to a 50% reduction of enterprise
income tax form the sixth to the tenth years.
In case a foreign-funded enterprise that is encouraged by the state to develop
imports self-use equipment, it will be exempted from duties and value added
tax. When a foreign invested enterprise procures domestically manufactured
equipment and when the value of such purchase is within the total amount of
investment, the full amount of value-added tax on such domestic equipment will
be refunded and regarded as a creditable amount in business income tax.
Since the project site is within the jurisdiction of Yantai Economic & Technological
Development Zone (YETDZ), in addition to the relevant preferential policies
formulated by the State Government, the project will be granted more preferential
treatments, which are stipulated for the national level Economic & Technological
Development Zones, in terms of taxation, land utilization and infrastructure
facilities.
To promote the development of WesternYantaiPort, Yantai Municipal Government
has formulated a series of preferential policies in respect of the utilization
of land and sea area as well as the construction of infrastructure.
10.Supporting Facilities & Conditions
- Water supply: There is a independent water supply system in this area,
the capacity of which is 200,000 cubic meters per day and will be increased
to 300,000 cubic meters per day according to the ¡°11th Five-Year-Plan¡±.
- Power supply: In the project area, power is supplied by a dual circuit
(i.e. Huabei Power Network and Shandong Power Network.) so that the power
resource is sufficient. Now there are one substation of 220KV, 8 substations
of 110KV and 5 substations of 35KV. According to the planning, another 3
substations of 110KV are to be built up specially for this project in the
future.
- Heating: At present, there are two thermo-electric plants in Yantai Economic & Technological
Development Zone (YETDZ), with a capacity of 360 tons per hour.
- Natural gas: The existing capacity of natural gas is 380,000 cubic meters
per day.
11.Contact
For any further questions and information, please contact us at:
Strategic Planning Dept.
Yantai Port Group Co., Ltd.
155 Beima Road, Yantai 264000
Tel.:0086-535-6742151, 6743527Fax:0086-535-6742151
E-mail:liushaoli@yantaiport.com.cnalexsun1970@yahoo.com.cn
|