Conventional Cargo Berth 1.Project
Site
The Western Area of Yantai Port is situated in the west of the city proper,
as well as besides the northeast sea of DajijiaVillage in Yantai Economic & Technological
Development Zone (YETDZ), with a distance of 35 km on the sea and a distance
of 30 km on land to ZhifuBay. The proposed crude oil terminal is located in
the northeast of the western port area.
2. Project Scope
Three conventional berths of 50,000-100,000 DWT shall be built under this
project, with an alongside water depth of ¨C14.5 meters, a total quay length
of 950 meters and a designed annual traffic capacity of 8 million tons. The
project is to be commenced in 2006. One berth is expected to be finished by
the end of 2007, while the other two will be completed in the first half of
2008.
3. Project Progress
The planning of the quay line under this project has been approved by the
relevant governmental authorities. And now the preliminary design documents
have been submitted to higher authorities for review and approval.
4.Traffic Analysis
YEDA is endeavoring to attract two projects to settle down in this area, one
is an alumina processing project of Aluminum Group of China (with an annual
product capacity of 1.2-1.4 million tons), and the other one is LS copper smelting
project. It is estimated that these two projects will bring about 3.5 million
tons of imported bauxite, 2.5 million tons of fine copper mine and 1.5 million
tons of exported alumina per annum. Furthermore, this terminal can also be
used for handling operations of coal export and some bulk cargo transferred
from Zhifu Bay Port Area. In this view, the estimated annual throughput is
projected at over 8 million tons.
5.Distribution and Transportation Conditions
Railway:The inner-port railway, connecting with the national railway network
through Lancun-Yantai railway, possesses an outstanding transport capacity.
Meanwhile two additional railway lines (i.e. Dezhou-Longkou-Yantai and Huanghua-Longkou-Yantai)
are under construction and will be fully completed for operation in 2008.
Road: According to the planning, several port access roads will be integrated
with the provincial road network by direct connection with Tongjiang-Sanya
Expressway, Weihai-Wuhai Expressway and No. 206 National Road.
6.Investment
The total investment of the project is estimated to be RMB 1 billion yuan.
7.Cooperation Partners
For the purpose of this project, we are willing to cooperate with the famous
logistics service providers, shipping companies, terminal operators and investment
companies all over the world.
8.Cooperation Mode
A limited company shall be established by relevant parties for the construction
and operation of the terminals.
|